Wednesday, 19 December 2012
Music Video Evaluation (Barrington)
Evaluation
How did that Video work?
The video worked through
the hard work and consistency of the producers, editors and actors as well as
the audience they all worked as a team for.
We all learnt many
lessons from the experience, for example; We learnt how to take leadership
roles, make quick decisions and/or improvising where necessary, the procedures,
advantages and disadvantages of filming music videos; only naming a few.
What would make it better?
It would have been
better if we had more money to fund our production. This means we may have had
more lighting equipment, better cameras/actors/props, and overall more variety
in the video without as many limitations.
Also if there were more
people working on the project, we may have got work done faster, with less
effort and to a higher standard.
What did the people who Helped, Watched
or Shot the video think?
They thought that there
were a few minor draw-backs throughout the project’s duration. However only
small changes were suggested. These changes included adding Aspect ratio,
different background footage and a more detailed story, which after explanation
were withdrawn and understood.
What will I do
differently next time?
Next time, we’ll hope to
begin working MUCH faster and be hands-on with the ideas and processes we’ll
need to take on. We also hope to add more locations and equipment with better
funding or different providers to contribute towards our project. We will also
choose our editing software beforehand to ensure quick, reliable movement with
no delay through the course of our work.
Risk Assessment (Barrington)
Activity | Hazard | Control measure |
Moving props | Someone getting injured eg pulling a muscle, putting strain on their back | If a piece of equipment is to heavy ask someone for help.Carry one object at a time. |
Tripping on wires and camera equipment | Breaking Equipment or hurting yourself | Move the equipment carefully and be aware of where the wires are |
Editing for a long period of time | Straining eyes may also cause headaches | Take turns in editing and take breaks when needed |
production schedule (Barrington)
Production Schedule
Location
Fairbourne avenue
Tottenham
London
02089761903
Scenes
Scene 1- Ruffle Snuffle (Character 1)
Scene
2-That guy In The Jumper Who Can’t Talk (Character 2)
Scene
3 -The Boy With The Sack On His Head Who Is Related To That Guy In The Jumper
Who Can’t Talk But Has Canerows That You Can’t See Because Of his Sack
(Character 3)
Equipment
needed
-Canon 550D
-Tamron Telephoto Lens
-Canon Standard Lens
-Canon Wide Lens
-Tripod
-iPhone 4 (With an App for
Lighting)
-Sony Ericsson Xperia
(With an App for Lighting)
-Nokia (With a
Flash-Light)
-Thin Blue Carrier Bag (as
filter)
People
needed
Kameron
Brown
Kiana-Eshe
Hoji
Javid Thomas
Javid Thomas
Equipment list (Barrington)
Equipment List
Vato Gonzalez ft. Foreign Beggars – Badman
Riddim (Jump) (Music Video)
-Canon 550D
-Tamron Telephoto Lens
-Canon Standard Lens
-Canon Wide Lens
-Tripod
-iPhone 4 (With an App for Lighting)
-Sony Ericsson Xperia (With an App for Lighting)
-Nokia (With a Flash-Light)
-Thin Blue Carrier Bag (as filter)
call sheet (Barrington)
Call
sheet- Music video
Song
“Vato
Gonzalez ft Foreign Beggar’’- Badman Riddim
Shooting date
9th
December 2012
Crew details
Kameron Brown- kbthephotographer@hotmail.co.uk
Roles- director, Art Director, Production manager
Roles- 1st assistant director, Editor
Location details
Fairbourne avenue
Tottenham
London
02089761903
Health and social notes
1.
Environment- not busy (only cast and crew)
2.
Clothing:
Ruffle Snuffle (Character 1)
Beige/ Brown Blazer Jacket, Blue Denim Jeans, Bow tie, Sun
Glasses.
That
guy In The Jumper Who Can’t Talk (Character 2)
Fully
Zipped Hooded jumper, Denim Jeans, Katana Sword, Prayer Beads.
The
Boy With The Sack On His Head Who Is Related To That Guy In The Jumper Who
Can’t Talk But Has Canerows That You Can’t See Because Of his Sack (Character 3)
Brown Paper Carrier Bag, Red Cape, Carrot,
Shirt, Jeans
Schedule
Call time- 12.00
Scene 1- 13.00
Scene 2- 13.45
Scene 3-14.30
Scene 4-15.15
Wrap- 16.00
Transport/travel schedules
All crew and cast will
travel by bus
Equipment
Camera and lights
Facilities
Toilets
Food and drink
Expenses
Crew and cast bring back receipts
so they can claim expenses.
Weather forecast
The location is indoors
(room temperature)
Tuesday, 18 December 2012
Annoying orange effect
1. Put footage and the picture of the orange onto the timeline
2.Bring up the scale of the orange to match your clip
3.
Subscribe to:
Posts (Atom)